Film gallery
Building process Offshore Windpark Q7 filmed.
Press play to watch a video.
More videos to follow soon.
Impression entire building process
Placing Last foundation pile
(source: Chris Westra Produkties)
Laying the landcable
Shipping the transformer station
Transport and storage wind turbine parts
Laying the 150kV sea cabl
Laying the 22 kV cables between the turbines
Installation of the last turbine